Future Growth Project Office Facilities
Mess Hall Future Growth Project / Wellhead Pressure Management Project.
Location: Tengiz / Kazakhstan
Period: 2018 - (ongoing)
Planned Completion Date: October 2019
Client: TCO (Tengiz Chevron Oil) / Gate
The scope of work consists of engineering, procurement, construction and commissioning of HVAC (including automation) works of indicated 5 office buildings, in accordance with the current editions of international codes, standards and project specifications.
Activity Basis Scope of Supply:
- Engineering
- Procurement
- Construction
- Commissioning and Hand Over
Sub-discipline Basis Scope of Supply:
- HVAC Systems
- Cold Room Refrigeration Systems
- HVAC Systems Power Supply System
- HVAC System Control and Instrumentation
Project in brief:
- 5 Buildings
- 1.562 meters copper piping
- 3.805 sqm Light Gage Ductwork
- 10 Air Handling Units
- 20 Direct Expansion Condensing Unit
- 24 Extract Fans
- 10 HVAC Control Panel
- 10 HVAC MCC Panel