Gemlik New Urea Plant Electrical & Instrumentation Substation Works

Gemlik New Urea Plant Electrical & Instrumentation Substation Works

Locations: Gemlik / Turkey
Start: 2022 - (ongoing)
Planned Completion Date: Q4/2024
Client: Gemlik Gübre
Main Contractor: Maire Tecnimont SpA

Scope of work consist of installation of the electrical & instrumentation and lighting systems.

Activity Basis Scope of Supply:

  • Detailed Engineering
  • Bulk Material Procurement
  • Installation
  • Testing / Pre-commissioning

Scope of Supply:

  • Instrument Installation
  • Installation of The Process/Electric/Pneumatic/Hydraulic Connections
  • Installation of The Heat Tracing and Heating Protection Boxes
  • Installation of Cabinets, Workstation, Consoles, Mimic Panels Etc
  • Calibration of Instruments / Valves and Devices
  • Installation of Lighting Works
Gemlik New Urea Plant Electrical & Instrumentation Substation Works