Gemlik New Urea Plant Electrical & Instrumentation Substation Works
Locations: Gemlik / Turkey
Start: 2022 - (ongoing)
Planned Completion Date: Q4/2024
Client: Gemlik Gübre
Main Contractor: Maire Tecnimont SpA
Scope of work consist of installation of the electrical & instrumentation and lighting systems.
Activity Basis Scope of Supply:
- Detailed Engineering
- Bulk Material Procurement
- Installation
- Testing / Pre-commissioning
Scope of Supply:
- Instrument Installation
- Installation of The Process/Electric/Pneumatic/Hydraulic Connections
- Installation of The Heat Tracing and Heating Protection Boxes
- Installation of Cabinets, Workstation, Consoles, Mimic Panels Etc
- Calibration of Instruments / Valves and Devices
- Installation of Lighting Works